The floor is almost finished and has been a bloody nightmare because the base wasn't level to start with. So after much packing and levelling and swearing (lots of swearing!) we've got the laminate 98% stable and secure over the whole floor. Now we've given up for the day because the temperature has soared to over 30 deg in there.
Saturday, July 26, 2008
Conservatory: Almost finished!
The floor is almost finished and has been a bloody nightmare because the base wasn't level to start with. So after much packing and levelling and swearing (lots of swearing!) we've got the laminate 98% stable and secure over the whole floor. Now we've given up for the day because the temperature has soared to over 30 deg in there.
Moblogged by Helen at 7/26/2008 11:55:00 am